Terry's Music site - Barefootterry | home
back to
Resume for Terry
click on the left side or underlined, to navagate
and sorry for the adds, as this is a free site
with audio demo file
please select one of the above ^
Email me at----- Marriedt@aol.com
or call me 5413861044
also; to Print or Download a hardcopy,
choose from one of these formats
I built this site myself and am working the bugs,
please feel free to post an error report if found;
to MarriedT@aol.com
--------------------
-----
Seeking an Audio Production/ProTools Production Position;
Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.
I have the ability to properly coordinate personnel in the logistics of sound recording, staying on task and achieving the best product in the least amount of time.
Knowledgeable in ProTools audio systems, disc allocation techniques, plugins, automation, video editing, sample rates and depths, and analog recording devices.
Wizardry in recording consoles, patch bays and routing signals, compressive knowledge of I/O and the effective use of effects.
Can perform many tasks in the music production field, including audio engineering and track production, and can function as a Music Producer, field engineer for live remotes, live shows and sound reinforcement production recordings.
Post production skills in surround sound mixing 5.1 to Sony 7.1, including a stint with Sony in the Culver City DVD post production facility, under Peter McEvoy.
Creative, extensive skills in Apple and Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books. I have written programs in MS Excel. Basic and assembler languages.
Proficient in Web Site design and maintenance. Using Trelix web design programs
A team player in the entire process of acquiring and completing projects.
Click here for a stereo demo of some of my work;
Please check>>>>
Click> www.myspace.com/barefootterry
or click> www.soundclick.com/bands/pageartist.cfm?bandID=354585
for some of my audio production works;
-----------------------
EDUCATION
Litton Industries Management training (4yrs)
Superintendent Training, Haskell Corp.
Digidesign seminar on 5.0.1 systems
AGC Harassment seminar
1973-1975 AA in Radio and Television Prod. Pierce College
1969-1973 High School diploma ST. Genevieve’s H.S.
EMPLOYMENT
Litton Industries Data Systems division
Wizard and Big Cheese analog live music production facility
Thorough knowledge of the D.A.W. systems at numerous production sites
Sony Culver City DVD post production facility with ProTools 6.0
Books on the subject;
Up the Organization by CEO Robert Townsend, "catch your employees doing good things
and comend them, rather that constantly goading them with negitive mistakes"
Peacemaking by Barbara Stanford, comes in handy, onsite.
These are tactics to run "Peaceful" jobs, clicking along,
rather than abrupt, "Wars" of personalities and ego's
True North by CEO Bill George, Engage your employees to Lead.
There is a new generation of authentic leaders, in it for the long run,
not just for short term gain.
I know this work.
I know this work
-----------------------------
Seeking Superintendent Position;
30 yrs in the Construction Industry. 8 years as Site Superintendent, Two years as an Assistant Superintendent, and 14 years as a General / Carpenter Forman.
Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.
I have the ability to properly coordinate subcontractors in the logistics of the site and the fulfillment of their ontract requirements.
Knowledgeable in reading blueprints and drawings. Using arithmetic and geometry to calculate amounts of materials to be needed, dimensions to be followed and costs of materials, desired for specific project functions.
Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books.
I have written programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation.
Proficient in Web Site design and maintenance. Using Trelix web design programs, and Digital Audio Workstations including ProTools and Cakewalk.
I have built numerous buildings as Superintendent, including several very large works. The North west Transmission line, gas pipeline compressor station expansion. Meacham Oregon. I ran the entire civil site work including the buildings and all pipe works. This job was for Haskel Construction, their main office is in Bellingham Washington.
One of the hospital Jobs was a Hemodialisis, expansion/ addition. For the Hood River Hospital. This was a Three-story project including a mixed shell design building. Tilt up basement with a steel web interior. Including the membrane style roof and the full use lab. This was completed for Otkm Construction in Portland Oregon. Laura Schauer 503 241 2875 also a few other Tenant remodels.
Numerous Controlled atmosphere buildings for Diamond Fruit and Duckwall fruit packers and shippers. These are sandwich Tiltup buildings, For RG Richardson. Wenatchee, Washington.
My Personal Characteristic's;
1. Positive outlook
2. Professional approach to job tasks
3. Knowledge of building concepts
4. Ability to facilitate change
5. Friendly, professional relationships with the people involved with the job
6. Ability to disseminate and delegate tasks
7. Logistical thought process
8. Respect from other co-workers
A team player in the entire process of acquiring and completing projects.
Union Carpenter for 22 years.
In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
Spandrel and Red-iron Bridges, Tilt ups to Housing jobs, including Single Family Dwellings.
Performed in all capacities from rough form work,a proficent welder, site layout, to fine finish
work, doors and hardware, and lots punch list work.
Performed these job duties as; Hand, Forman, General Forman (mostly),
also Site Superintendent, Interior cordinator and Project Coordination.
Special expertise in Huge, Large, Midsize, and Small Buillding Projects,
Andersen Construction acco,
** Joe Henery supt, on the Pacific Oncology Building, concrete to punch.
**John Bradford interior finish supt. Install appliances and high end wood, also punch list work.
**Mark Rouse, supt, The Metropolotian, High Rise Condo's , concrete, saftey, odds and ends and punch.
keeping track of Wes Foster.
**Larry Snow,Andy Swan and Bill Salvey, Hood River Hospital, demo to doors and finish. Phase 3 large remodel of the Hospital.
Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.
Doors and hardware, including all panic and fine finish hardware.
Schommer and Sons, Craig and Bob Schommer, Hood River Hospital Phase 1, Doubled the size of the existing Building. Tiltup and Steel, three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.
OTKM Construction,(O'Brian Construction), General Forman on the Hood River Hemodiallisis addition, K.C.Brown, Poured In place, and the "Drivit System" arround steel frame,-- to match existing, with three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.
Haskell corp. Was the Site Superintendant for the North West Natural Gas Pipeline expansion west, including all buildings and site grading. jet engine gas compressor pads and pipe cement stands.
4 Years with Jorgens Const,Tilt ups, Regie Smith.
Several Projects with GG Richartdson Const. Bud Newberry, as General Forman, doing sandwich pannel tilt ups, for Fruit Controled Atmisphere Storage buildings. Panel design and Layout. Roof systems, berkley panel, metal and hollow core concrete roof systems. Slab design and rebar. Underground Piping and Electrical. Including complete finish work and punch.
Emerick Construction, David Berg, Mike Burton, 6-8 yrs off and on, of HighSchools, BPA and Hewelet Packard, Vancouver a. large remodels and demo work. Doors, finish, punch, as well as from the footings to handing the keys to the owners. also a crane rail job at Bonneville Damn between Powerhouse 2 and the Spillway.
Hood River High School, Centinenial High Scool, Estacada High Schools.
Hoffman Construction, Rory Neive and Stan Presby. Numerious High Rise buildings.
also for Greg Borsna, on the Dalles and Skamania County jails, complete job
Baugh Const. Ted Gay, South Park Square, 16 story housing, footings to complete finish, doors, and punch list work.
Sabey Construction, General Forman on, The Dalles Post Office. Complete Job.
Walsh Construction, Ed Botts, Exterior finish Forman, Select Cedar Siding, Complete exterior of The Dalles
Interpert center.
Mowatt Construction, Tom Duffy, Expansion of the Hood River Bridge
Kewitt / Al Johnston , Dan Mansuir, Forman for the Ships brow on the upstream intake section for the Navagation Locks at Bonneville Damn.
Also worked mid-locks doing slip forms for the main channel walls, between the Water tunnels for the intake exhale fill system for the main pool of the locks.
Alliance Systems replace exterior doors and holowmetal jambs for the Homeland Security upgrade at the Bonneville Damn.
This list is not inclusive---------
Operate all machinery and have a 100 ton crane card.
vehicals on Rubber and Tracks. Backhoes, Trackhoes, Plows, bobcats, boom trucks.
In 1977, I started in this business, packing plywood in the home framing industry on Sunnyside Road.
Graduated to tilt ups and then on to highrise work, to finish, doors and cabinet work.
To supervision, to well, --all of it.
EDUCATION
Litton Industries Management training (4yrs)
Superintendent Training, Haskell Corp.
Forman upgrade skills training
AGC Harassment seminar
AGC crane class
1973-1975 AA in Radio and Television Prod. Pierce College
1969-1973 High School diploma ST. Genevieve’s H.S.
EMPLOYMENT
Systems Test Engineer for Litton Industries for 10 years
Books on the subject;
Up the Organization by CEO Robert Townsend, "catch your employees doing good things
and comend them, rather that constantly goading them with negitive mistakes"
Peacemaking by Barbara Stanford, comes in handy, onsite.
These are tactics to run "Peaceful" jobs, clicking along,
rather than abrupt, "Wars" of personalities and ego's
True North by CEO Bill George, Engage your employees to Lead.
There is a new generation of authentic leaders, in it for the long run,
not just for short term gain.
I know this work.
------------------------------------
General Resume
Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.
I have the ability to properly coordinate Field Employees and Subcontractors, in the logistics of their site and the fulfillment of their job and project requirements.
30 yrs in the Construction Industry. 4yrs Project Manager, 4yrs as Site Superintendent, Two years as an Assistant Superintendent, and 12 years as a General / Carpenter Forman.
Excellent skills in scheduling, and job planning. Proficient in the hiring of subcontractors desired for specific project functions. Excellent written and verbal skills.
Excellent working knowledge of survey and elevations. Knowledgeable in reading blueprints and drawings. Abilities with purchase orders, review closeouts, project files, vender schedules.
Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel(spreadsheets), MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books.
I have written programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation
Proficient in Web Site design and maintenance. Using Trelix web design programs, and Digital Audio Workstations including ProTools and Cakewalk.
A team player in the entire process of Maintaining and Completing projects.
Union Carpenter for 22 years.
In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
Spandrel and Red-iron Bridges, Tilt ups to Housing jobs, including Single Family Dwellings.
Performed in all capacities from rough form work,a proficent welder, site layout, to fine finish
work, doors and hardware, and lots punch list work.
Performed these job duties as; Hand, Forman, General Forman (mostly),
also Site Superintendent, Interior cordinator and Project Coordination.
Special expertise in Huge, Large, Midsize, and Small Buillding Projects,
Andersen Construction acco,
** Joe Henery supt, on the Pacific Oncology Building, concrete to punch.
**John Bradford interior finish supt. Install appliances and high end wood, also punch list work.
**Mark Rouse, supt, The Metropolotian, High Rise Condo's , concrete, saftey, odds and ends and punch. keeping track of Wes Foster.
**Larry Snow, Andy Swan and Bill Salvey, Hood River Hospital, demo to doors and finish. Phase 3 large remodel of the Hospital.
Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.
Doors and hardware, including all panic and fine finish hardware.
Schommer and Sons, Craig and Bob Schommer, Hood River Hospital Phase 1, Doubled the size of the existing Building. Tiltup and Steel, three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.
OTKM Construction,(O'Brian Construction), General Forman on the Hood River Hemodiallisis addition,Phase 2, K.C.Brown( superintendant), Poured In place, and the "Drivit System" arround steel frame,-- to match existing, with three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.
Haskell corp. Was the Site Superintendant, for the North West Natural Gas Pipeline expansion west, including all buildings and site grading. jet engine gas compressor pads and pipe cement stands.
4 Years with Jorgens Const,Tilt ups, Regie Smith.
Several Projects with GG Richartdson Const. Bud Newberry, as General Forman, doing sandwich pannel tilt ups, for Fruit Controled Atmisphere Storage buildings. Panel design and Layout. Roof systems, berkley panel, metal and hollow core concrete roof systems. Slab design and rebar. Underground Piping and Electrical. Including complete finish work and punch.
Emerick Construction, David Berg, Mike Burton, 6-8 yrs off and on, of HighSchools, BPA and Hewelet Packard, Vancouver a. large remodels and demo work. Doors, finish, punch, as well as from the footings to handing the keys to the owners. also a crane rail job at Bonneville Damn between Powerhouse 2 and the Spillway.
Hood River High School, Centinenial High Scool, Estacada High Schools.
Hoffman Construction, Rory Neive, Chris Linsey and Stan Presby. Numerious High Rise buildings.
also on the Dalles and Skamania County jails, complete job
Baugh Const. Ted Gay, South Park Square, 16 story housing, footings to complete finish, doors, and punch list work.
Sabey Construction, General Forman on, The Dalles Post Office. Complete Job.
Walsh Construction, Ed Botts, Exterior finish Forman, Select Cedar Siding, Complete exterior of The Dalles
Interpert center.
Mowatt Construction, Tom Duffy, Expansion of the Hood River Bridge
Kewitt / Al Johnston , Dan Mansuir, Forman for the Ships brow on the upstream intake section for the Navagation Locks at Bonneville Damn.
Also worked mid-locks doing slip forms for the main channel walls, between the Water tunnels for the intake exhale fill system for the main pool of the locks.
Alliance Systems replace exterior doors and holowmetal jambs for the Homeland Security upgrade at the Bonneville Damn.
Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.
This list is not inclusive---------
Operate all machinery and have a 100 ton crane card.
vehicals on Rubber and Tracks. Backhoes, Trackhoes, Plows, bobcats, boom trucks.
In 1977, I started in this business, packing plywood in the home framing industry on Sunnyside Road.
Graduated to tilt ups and then on to highrise work, to finish, doors and cabinet work.
To supervision, to well, --all of it.
My Personal Characteristic's;
1. Positive outlook
2. Professional approach to job tasks
3. Knowledge of building concepts
4. Ability to facilitate change
5. Friendly, professional relationships with the people involved with the job
6. Ability to disseminate and delegate tasks
7. Logistical thought process
8. Respect from other co-workers
9. Large left thumb, from smacking it with a hammer
EDUCATION
Litton Industries Management training (4yrs)
Site management, community education classes
Site Superintendent Training, Haskell Corp.
Forman upgrade skills training
Books on the subject;
Up the Organization by CEO Robert Townsend, "catch your employees doing good things
and comend them, rather that constantly goading them with negitive mistakes"
Peacemaking by Barbara Stanford, comes in handy, onsite.
These are tactics to run "Peaceful" jobs, clicking along,
rather than abrupt, "Wars" of personalities and ego's
True North by CEO Bill George, Engage your employees to Lead.
There is a new generation of authentic leaders, in it for the long run,
not just for short term gain.
I know this work.
Specific Working cards and training
AGC Harassment seminar,
AGC crane class 100 ton rating
Boom Truck certified
Rough Trane Forklift Card holder
Scafold user and Erector cards
Classes in Trade Show work
Doors and Hardware Card
Theatolite Job site Layout Trained
Schooling
1973-1975 Radio and Television Prod. Pierce College
1969-1973 High School diploma
EMPLOYMENT
Systems Test Engineer for Litton Industries for 3 years
_____________________________________________________
Seeking Project Manager Position;
24 yrs in the Construction Industry. 4yrs Project Manager, 4yrs as Site Superintendent, Two years as an Assistant Superintendent, and 8 years as a Carpenter Forman.
Excellent skills in estimation and job planning. Proficient in the hiring of subcontractors desired for specific project functions.
Excellent working knowledge of survey and elevations. Knowledgeable in reading blueprints and drawings.
Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books.
I have written programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation
Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.
I have the ability to properly coordinate subcontractors in the logistics of the site and the fulfillment of their contract requirements.
Proficient in Web Site design and maintenance. Using Trelix web design programs, and Digital Audio Workstations including ProTools and Cakewalk.
A team player in the entire process of acquiring and completing projects.
Union Carpenter for 22 years.
In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
Spandrel and Red-iron Bridges, Tilt ups to Housing jobs, including Single Family Dwellings.
Performed in all capacities from rough form work,a proficent welder, site layout, to fine finish
work, doors and hardware, and lots punch list work.
Performed these job duties as; Hand, Forman, General Forman (mostly),
also Site Superintendent, Interior cordinator and Project Coordination.
Special expertise in Huge, Large, Midsize, and Small Buillding Projects,
Andersen Construction acco,
** Joe Henery supt, on the Pacific Oncology Building, concrete to punch.
**John Bradford interior finish supt. Install appliances and high end wood, also punch list work.
**Mark Rouse, supt, The Metropolotian, High Rise Condo's , concrete, saftey, odds and ends and punch. keeping track of Wes Foster.
**Larry Snow, Andy Swan and Bill Salvey, Hood River Hospital, demo to doors and finish. Phase 3 large remodel of the Hospital. 2008-2009
Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.
Doors and hardware, including all panic and fine finish hardware.
Schommer and Sons, Craig and Bob Schommer, Hood River Hospital Phase 1, Doubled the size of the existing Building. Tiltup and Steel, three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.
OTKM Construction,(O'Brian Construction), General Forman on the Hood River Hemodiallisis addition, K.C.Brown, Poured In place, and the "Drivit System" arround steel frame,-- to match existing, with three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.
Haskell corp. Was the Site Superintendant for the North West Natural Gas Pipeline expansion west, including all buildings and site grading. jet engine gas compressor pads and pipe cement stands.
4 Years with Jorgens Const,Tilt ups, Regie Smith.
Several Projects with GG Richartdson Const. Bud Newberry, as General Forman, doing sandwich pannel tilt ups, for Fruit Controled Atmisphere Storage buildings. Panel design and Layout. Roof systems, berkley panel, metal and hollow core concrete roof systems. Slab design and rebar. Underground Piping and Electrical. Including complete finish work and punch.
Emerick Construction, David Berg, Mike Burton, 6-8 yrs off and on, of HighSchools, BPA and Hewelet Packard, Vancouver a. large remodels and demo work. Doors, finish, punch, as well as from the footings to handing the keys to the owners. also a crane rail job at Bonneville Damn between Powerhouse 2 and the Spillway.
Hood River High School, Centinenial High Scool, Estacada High Schools.
Hoffman Construction, Rory Neive and Stan Presby. Numerious High Rise buildings.
also for Greg Borsna, on the Dalles and Skamania County jails, complete job
Baugh Const. Ted Gay, South Park Square, 16 story housing, footings to complete finish, doors, and punch list work.
Sabey Construction, General Forman on, The Dalles Post Office. Complete Job.
Walsh Construction, Ed Botts, Exterior finish Forman, Select Cedar Siding, Complete exterior of The Dalles
Interpert center.
Mowatt Construction, Tom Duffy, Expansion of the Hood River Bridge
Kewitt / Al Johnston , Dan Mansuir, Forman for the Ships brow on the upstream intake section for the Navagation Locks at Bonneville Damn.
Also worked mid-locks doing slip forms for the main channel walls, between the Water tunnels for the intake exhale fill system for the main pool of the locks.
Alliance Systems replace exterior doors and holowmetal jambs for the Homeland Security upgrade at the Bonneville Damn.
This list is not inclusive---------
Operate all machinery and have a 100 ton crane card.
vehicals on Rubber and Tracks. Backhoes, Trackhoes, Plows, bobcats, boom trucks.
In 1977, I started in this business, packing plywood in the home framing industry on Sunnyside Road.
Graduated to tilt ups and then on to highrise work, to finish, doors and cabinet work.
To supervision, to well, --all of it.
EDUCATION
Litton Industries Management training (4yrs)
Site management, community education classes
Site Superintendent Training, Haskell Corp.
Forman upgrade skills training
AGC Harassment seminar, AGC crane class 100 ton rating
1973-1975 AA in Radio and Television Prod. Pierce College
1969-1973 High School diploma ST. Genevieve’s H.S.
EMPLOYMENT
22 yrs a Union Carpenter
In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
Tilt ups to Housing jobs, including Single Family Dwellings. Spandrel and Red-iron Bridges.
Performed in all capacities from rough form work, site layout, to fine finish work,
doors and hardware, and Supervision.
Books on the subject;
Up the Organization by CEO Robert Townsend, "catch your employees doing good things
and comend them, rather that constantly goading them with negitive mistakes"
Peacemaking by Barbara Stanford, comes in handy, onsite.
These are tactics to run "Peaceful" jobs, clicking along,
rather than abrupt, "Wars" of personalities and ego's
True North by CEO Bill George, Engage your employees to Lead.
There is a new generation of authentic leaders, in it for the long run,
not just for short term gain.
I know this work.
--------------------------------------------
Web Design-Site Management
Resume for Terry Murray
Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.
I have the ability to properly coordinate subcontractors in the logistics of the site and the fulfillment of their contract requirements.
Knowledgeable in reading blueprints and drawings. Using arithmetic and geometry to calculate amounts of materials to be needed, dimensions to be followed and costs of materials, desired for specific project functions.
Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit's Turbo Tax and Quick Books.
I have written programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation.
Proficient in Web Site design and maintenance. Using Trelix web design programs, and Digital Audio Workstations including ProTools and Cakewalk.
My Personal Characteristic's;
1. Positive outlook
2. Professional approach to job tasks
3. Knowledge of building concepts
4. Ability to facilitate change
5. Friendly, professional relationships with the people involved with the job
6. Ability to disseminate and delegate tasks
7. Logistical thought process
8. Respect from other co-workers
A team player in the entire process of acquiring and completing projects.
EDUCATION
Litton Industries Management training (4yrs)assembler language
Superintendent Training, Haskell Corp.
Forman upgrade skills training
AGC Harassment seminar
AGC crane class
1973-1975 AA in Radio and Television Prod. Pierce College
1969-1973 High School diploma ST. Genevieve's H.S.
EMPLOYMENT
Systems Test Engineer for Litton Industries for 10 years
22 yrs a Union Carpenter
Books on the subject;
Up the Organization by CEO Robert Townsend, "catch your employees doing good things
and comend them, rather that constantly goading them with negitive mistakes"
Peacemaking by Barbara Stanford, comes in handy, onsite.
These are tactics to run "Peaceful" jobs, clicking along,
rather than abrupt, "Wars" of personalities and ego's
True North by CEO Bill George, Engage your employees to Lead.
There is a new generation of authentic leaders, in it for the long run,
not just for short term gain.
I know this work.
Thank you for your time
---------------------------------------------------------------------------------------------
Lead, Follow or Get out of the Way!!
there is a time for everything under the sun.
(I built and maintain, all the following sites)
clickable yes
Dont forget my other sites;
Parts and stuff ;
Just click on what you need
the end
The music business is a cruel and shallow money trench, a long plastic hallway where thieves and pimps run free, and good men die like dogs. There's also a negative side.
- Hunter S. Thompson
----------------------------
|