Terry's Music site -  Barefootterry  |     home
back to                                                     
Resume for   Terry
click on the left side or underlined,  to navagate
and sorry for the adds, as this is a free site
General Resume  for Terry Murray
 (General Forman -Union Carpenter)  <<click











Seeking  Superintendent  Position     <<click



Seeking  Project Manager Position;     <<click    



 Audio Production--ProTools Production    <<click
with audio demo file

 Web Site - Build / Design    <<click

           
        
please select one of the above  ^

Email me at----- Marriedt@aol.com
or call me  5413861044

also; to Print or Download a hardcopy,
 choose from one of these formats
  Doc-word     Notepad


I built this site myself and am working the bugs,
 please feel free to post an error report if found;
 to MarriedT@aol.com
--------------------



-----

    Seeking an   Audio Production/ProTools Production Position;

Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.

I have the ability to properly coordinate personnel in the  logistics of  sound recording, staying on task and achieving the best product in the least amount of time.

Knowledgeable in ProTools audio systems, disc allocation techniques, plugins, automation, video editing, sample rates and depths, and analog recording devices.

Wizardry in recording consoles, patch bays and routing signals,  compressive knowledge of I/O and the effective use of effects.

Can perform many tasks in the music production field, including audio engineering and track production, and can function as a Music Producer, field engineer for live remotes, live shows and sound reinforcement production recordings.

Post production skills in surround sound mixing 5.1 to Sony 7.1, including a stint with Sony in the Culver City DVD post production facility, under Peter McEvoy.

Creative, extensive skills in Apple and Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books. I have written  programs in MS Excel. Basic and assembler languages.
Proficient in Web Site design and maintenance. Using Trelix web design programs
    
A team player in the entire process of acquiring and completing projects.

Click here for a stereo demo of some of my work;
mailto:marriedt@aol.com  ask for production demo in the subject

Please check>>>>

     Click>      www.myspace.com/barefootterry

        or        click>  www.soundclick.com/bands/pageartist.cfm?bandID=354585

for some of my audio production works;

-----------------------
EDUCATION
    Litton Industries Management training  (4yrs)                
              Superintendent Training, Haskell Corp.
    Digidesign seminar on 5.0.1 systems
    AGC Harassment seminar
             1973-1975      AA in Radio and Television  Prod. Pierce College
             1969-1973    High School diploma  ST. Genevieve’s H.S.

    EMPLOYMENT
    Litton Industries Data Systems division
    Wizard and Big Cheese analog  live music production facility
    Thorough knowledge of the  D.A.W.  systems at numerous production sites
    Sony Culver City DVD post production facility with ProTools 6.0

            Books on the subject;

            Up the Organization by CEO Robert Townsend, "catch your employees doing good things
            and comend them, rather that constantly goading them with negitive mistakes"

            Peacemaking by Barbara  Stanford, comes in handy, onsite.
           These are tactics to run "Peaceful" jobs, clicking along,
            rather than abrupt,  "Wars" of personalities and ego's

            True North  by CEO  Bill George, Engage your employees to Lead.
           There is a new generation of authentic leaders, in it for the long run,
           not just for short term gain.

           I know this work.
            I know this work
  mailto:Marriedt@aol.com                                            Back to Top
-----------------------------







 Seeking  Superintendent  Position;  

30 yrs in the Construction Industry. 8 years as Site Superintendent, Two years as an Assistant Superintendent, and 14 years as a General / Carpenter Forman.

Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.

I have the ability to properly coordinate subcontractors in the logistics of    the site and the fulfillment of their ontract requirements.

Knowledgeable in reading blueprints and drawings. Using arithmetic and geometry to calculate amounts of materials to be needed, dimensions to be followed and costs of materials, desired for specific project functions.

Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books.
I have written  programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation.

Proficient in Web Site design and maintenance. Using Trelix web design programs,  and Digital Audio Workstations including  ProTools and Cakewalk.

I have built numerous buildings as Superintendent, including several very large works. The North west Transmission line, gas pipeline compressor station expansion. Meacham Oregon. I ran the entire civil site work including the buildings and all pipe works. This job was for Haskel Construction, their main office is in Bellingham Washington.

One of the hospital Jobs was a Hemodialisis, expansion/ addition. For the Hood River Hospital. This was a Three-story project including a mixed shell design building. Tilt up basement with a steel web interior. Including the membrane style roof and the full use lab. This was completed for Otkm Construction in Portland Oregon. Laura Schauer 503 241 2875 also a few other Tenant remodels.      

 Numerous Controlled atmosphere buildings for Diamond Fruit and Duckwall fruit packers and shippers.      These are sandwich Tiltup      buildings, For RG Richardson. Wenatchee, Washington.

     My Personal Characteristic's;   

   1. Positive outlook
    2. Professional approach to job tasks     
    3. Knowledge of building concepts   
    4. Ability to facilitate change
    5. Friendly, professional relationships with the people involved with the job
    6. Ability to disseminate and delegate tasks
     7. Logistical thought process
     8. Respect from other co-workers


    A team player in the entire process of acquiring and completing projects.

 Union Carpenter for 22 years.

     In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
    Spandrel and  Red-iron Bridges, Tilt ups to Housing jobs, including Single Family Dwellings.
    Performed in all  capacities from rough form work,a proficent welder, site layout, to fine finish
    work, doors and hardware,    and lots punch list work.
    Performed these job duties as;  Hand, Forman, General Forman (mostly),
    also Site Superintendent, Interior cordinator and Project Coordination.


Special expertise in Huge, Large, Midsize, and Small  Buillding Projects,

 Andersen Construction acco,
** Joe Henery supt, on the Pacific Oncology Building, concrete to punch.
**John Bradford interior finish supt. Install appliances and high end wood, also punch list work.
**Mark Rouse, supt, The Metropolotian, High Rise Condo's , concrete, saftey, odds and ends and punch.
                           keeping track of  Wes Foster.

**Larry Snow,Andy Swan and  Bill Salvey,   Hood River Hospital, demo to doors and finish. Phase 3 large remodel of the Hospital.

Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.

Doors and hardware, including all panic and fine finish hardware.

Schommer and Sons, Craig and Bob Schommer, Hood River Hospital Phase 1, Doubled the size of the existing  Building. Tiltup and Steel, three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.

 OTKM Construction,(O'Brian Construction), General Forman on the Hood River Hemodiallisis addition, K.C.Brown, Poured In place, and the "Drivit  System" arround steel frame,-- to match existing, with three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.

Haskell corp.  Was the Site Superintendant for the North West Natural Gas Pipeline expansion west, including all buildings and site grading. jet engine gas compressor pads and pipe cement stands.

4 Years with Jorgens Const,Tilt ups, Regie Smith.

Several Projects with GG Richartdson Const. Bud Newberry, as General Forman, doing sandwich pannel tilt ups, for Fruit Controled Atmisphere Storage buildings. Panel design and Layout. Roof systems, berkley panel, metal and hollow core concrete roof systems. Slab design and rebar. Underground Piping and Electrical. Including complete finish work  and punch.

Emerick Construction, David Berg,  Mike Burton, 6-8 yrs off and on, of HighSchools, BPA and Hewelet Packard, Vancouver a. large remodels and demo work.  Doors, finish, punch, as well as from the footings to handing the keys to the owners. also a crane rail job at Bonneville Damn between Powerhouse 2 and the Spillway.
Hood River High School, Centinenial High Scool, Estacada High Schools.

 Hoffman Construction, Rory Neive and Stan Presby. Numerious High Rise buildings.
also for Greg Borsna, on the Dalles and Skamania County jails, complete job

Baugh Const. Ted Gay, South Park Square, 16 story housing, footings to complete finish, doors, and punch list work.

Sabey Construction, General Forman on, The Dalles Post Office. Complete Job.

Walsh Construction, Ed Botts, Exterior finish Forman, Select Cedar Siding, Complete exterior of The Dalles
Interpert center.

Mowatt Construction, Tom Duffy,  Expansion of the Hood River Bridge

Kewitt / Al Johnston  , Dan Mansuir, Forman for the Ships brow on the upstream intake section for the Navagation Locks at Bonneville Damn.
Also worked mid-locks doing slip forms for the main channel walls, between the Water tunnels for the intake exhale fill system for the main pool of the locks.

Alliance Systems replace exterior doors and holowmetal jambs for the Homeland Security upgrade at the Bonneville Damn.

This list is not inclusive---------


     Operate all machinery and have a 100 ton crane card.
vehicals on Rubber and Tracks. Backhoes, Trackhoes, Plows, bobcats, boom trucks.    
     In 1977, I started in this business, packing plywood in the home framing industry on Sunnyside Road.

 Graduated to tilt ups and then on to highrise work, to finish, doors and cabinet work.

To supervision, to well, --all of it.

EDUCATION
    Litton Industries Management training  (4yrs)                
            Superintendent Training, Haskell Corp.
    Forman upgrade skills training
    AGC Harassment seminar
    AGC crane class
            1973-1975      AA in Radio and Television  Prod. Pierce College
            1969-1973     High School diploma  ST. Genevieve’s H.S.
    EMPLOYMENT
            Systems Test Engineer   for Litton Industries for 10 years

           Books on the subject;

            Up the Organization by CEO Robert Townsend, "catch your employees doing good things
            and comend them, rather that constantly goading them with negitive mistakes"

            Peacemaking by Barbara  Stanford, comes in handy, onsite.
           These are tactics to run "Peaceful" jobs, clicking along,
            rather than abrupt,  "Wars" of personalities and ego's

            True North  by CEO  Bill George, Engage your employees to Lead.
           There is a new generation of authentic leaders, in it for the long run,
           not just for short term gain.

           I know this work.

    <<click on to email                                      Back to Top
------------------------------------  












 General Resume

Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.
I have the ability to properly coordinate Field Employees  and Subcontractors, in the logistics of their site and the fulfillment of their job and project requirements.

30 yrs in the Construction Industry. 4yrs Project Manager, 4yrs as Site Superintendent, Two years as an Assistant Superintendent, and 12 years as a General / Carpenter Forman.

Excellent skills in scheduling, and job planning. Proficient in the hiring of subcontractors desired for specific project functions. Excellent written and verbal skills.

Excellent working knowledge of survey and elevations. Knowledgeable in reading blueprints and drawings.  Abilities with purchase orders, review closeouts, project files, vender schedules.

Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel(spreadsheets), MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books.
I have written  programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation

Proficient in Web Site design and maintenance. Using Trelix web design programs,  and Digital Audio Workstations including  ProTools and Cakewalk.

     A team player in the entire process of Maintaining and Completing projects.

       Union Carpenter for 22 years.

     In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
    Spandrel and  Red-iron Bridges, Tilt ups to Housing jobs, including Single Family Dwellings.
    Performed in all  capacities from rough form work,a proficent welder, site layout, to fine finish
    work, doors and hardware,    and lots punch list work.
    Performed these job duties as;  Hand, Forman, General Forman (mostly),
    also Site Superintendent, Interior cordinator and Project Coordination.


Special expertise in Huge, Large, Midsize, and Small  Buillding Projects,

 Andersen Construction acco,
** Joe Henery supt, on the Pacific Oncology Building, concrete to punch.
**John Bradford interior finish supt. Install appliances and high end wood, also punch list work.
**Mark Rouse, supt, The Metropolotian, High Rise Condo's , concrete, saftey, odds and ends and punch.                           keeping track of  Wes Foster.
**Larry Snow, Andy Swan and  Bill Salvey,   Hood River Hospital, demo to doors and finish. Phase 3 large remodel of the Hospital.

Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.

Doors and hardware, including all panic and fine finish hardware.

Schommer and Sons, Craig and Bob Schommer, Hood River Hospital Phase 1, Doubled the size of the existing  Building. Tiltup and Steel, three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.

 OTKM Construction,(O'Brian Construction), General Forman on the Hood River Hemodiallisis addition,Phase 2,  K.C.Brown( superintendant), Poured In place, and the "Drivit  System" arround steel frame,-- to match existing, with three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.

Haskell corp.  Was the Site Superintendant,  for the North West Natural Gas Pipeline expansion west, including all buildings and site grading. jet engine gas compressor pads and pipe cement stands.

4 Years with Jorgens Const,Tilt ups, Regie Smith.

Several Projects with GG Richartdson Const. Bud Newberry, as General Forman, doing sandwich pannel tilt ups, for Fruit Controled Atmisphere Storage buildings. Panel design and Layout. Roof systems, berkley panel, metal and hollow core concrete roof systems. Slab design and rebar. Underground Piping and Electrical. Including complete finish work  and punch.

Emerick Construction, David Berg,  Mike Burton, 6-8 yrs off and on, of HighSchools, BPA and Hewelet Packard, Vancouver a. large remodels and demo work.  Doors, finish, punch, as well as from the footings to handing the keys to the owners. also a crane rail job at Bonneville Damn between Powerhouse 2 and the Spillway.
Hood River High School, Centinenial High Scool, Estacada High Schools.

 Hoffman Construction, Rory Neive, Chris Linsey and Stan Presby. Numerious High Rise buildings.
also on the Dalles and Skamania County jails, complete job

Baugh Const. Ted Gay, South Park Square, 16 story housing, footings to complete finish, doors, and punch list work.

Sabey Construction, General Forman on, The Dalles Post Office. Complete Job.

Walsh Construction, Ed Botts, Exterior finish Forman, Select Cedar Siding, Complete exterior of The Dalles
Interpert center.

Mowatt Construction, Tom Duffy,  Expansion of the Hood River Bridge

Kewitt / Al Johnston  , Dan Mansuir, Forman for the Ships brow on the upstream intake section for the Navagation Locks at Bonneville Damn.
Also worked mid-locks doing slip forms for the main channel walls, between the Water tunnels for the intake exhale fill system for the main pool of the locks.

Alliance Systems replace exterior doors and holowmetal jambs for the Homeland Security upgrade at the Bonneville Damn.

Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.

This list is not inclusive---------


     Operate all machinery and have a 100 ton crane card.
vehicals on Rubber and Tracks. Backhoes, Trackhoes, Plows, bobcats, boom trucks.    
     In 1977, I started in this business, packing plywood in the home framing industry on Sunnyside Road.

 Graduated to tilt ups and then on to highrise work, to finish, doors and cabinet work.

To supervision, to well, --all of it.

      My Personal Characteristic's;   

    1. Positive outlook
     2. Professional approach to job tasks     
     3. Knowledge of building concepts   
     4. Ability to facilitate change
     5. Friendly, professional relationships with the people involved with the job
     6. Ability to disseminate and delegate tasks
     7. Logistical thought process
     8. Respect from other co-workers
     9.  Large left thumb, from smacking it with a hammer

EDUCATION
     Litton Industries Management training  (4yrs)  
     Site management, community education classes            
     Site Superintendent Training, Haskell Corp.
     Forman upgrade skills training
            Books on the subject;

            Up the Organization by CEO Robert Townsend, "catch your employees doing good things
            and comend them, rather that constantly goading them with negitive mistakes"

            Peacemaking by Barbara  Stanford, comes in handy, onsite.
           These are tactics to run "Peaceful" jobs, clicking along,
            rather than abrupt,  "Wars" of personalities and ego's

            True North  by CEO  Bill George, Engage your employees to Lead.
           There is a new generation of authentic leaders, in it for the long run,
           not just for short term gain.

           I know this work.

Specific Working cards and training
     AGC Harassment seminar,
     AGC crane class  100 ton rating
     Boom Truck certified
     Rough Trane Forklift  Card holder
     Scafold user and Erector cards
     Classes in Trade Show work
     Doors and Hardware Card
     Theatolite Job site Layout Trained
Schooling
    1973-1975     Radio and Television  Prod.  Pierce College
    1969-1973     High School diploma  
EMPLOYMENT
     Systems Test Engineer   for Litton Industries for 3 years


  <<click on that                Back to Top
_____________________________________________________














 Seeking  Project Manager Position;

24 yrs in the Construction Industry. 4yrs Project Manager, 4yrs as Site Superintendent, Two years as an Assistant Superintendent, and 8 years as a Carpenter Forman.

Excellent skills in estimation and job planning. Proficient in the hiring of subcontractors desired for specific project functions.

Excellent working knowledge of survey and elevations. Knowledgeable in reading blueprints and drawings.

Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit’s Turbo Tax and Quick Books.
I have written  programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation

Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.

I have the ability to properly coordinate subcontractors in the logistics of the site and the fulfillment of their contract  requirements.

Proficient in Web Site design and maintenance. Using Trelix web design programs,  and Digital Audio Workstations including  ProTools and Cakewalk.

     A team player in the entire process of acquiring and completing projects.
 Union Carpenter for 22 years.

     In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
    Spandrel and  Red-iron Bridges, Tilt ups to Housing jobs, including Single Family Dwellings.
    Performed in all  capacities from rough form work,a proficent welder, site layout, to fine finish
    work, doors and hardware,    and lots punch list work.
    Performed these job duties as;  Hand, Forman, General Forman (mostly),
    also Site Superintendent, Interior cordinator and Project Coordination.


Special expertise in Huge, Large, Midsize, and Small  Buillding Projects,

 Andersen Construction acco,
** Joe Henery supt, on the Pacific Oncology Building, concrete to punch.
**John Bradford interior finish supt. Install appliances and high end wood, also punch list work.
**Mark Rouse, supt, The Metropolotian, High Rise Condo's , concrete, saftey, odds and ends and punch.                           keeping track of  Wes Foster.
**Larry Snow, Andy Swan and  Bill Salvey,   Hood River Hospital, demo to doors and finish. Phase 3 large remodel of the Hospital. 2008-2009

Hospital work, including tenting, temp walls and doors. Negitave air, ISLM proceedures for modern clean hospital remodels.

Doors and hardware, including all panic and fine finish hardware.

Schommer and Sons, Craig and Bob Schommer, Hood River Hospital Phase 1, Doubled the size of the existing  Building. Tiltup and Steel, three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.

 OTKM Construction,(O'Brian Construction), General Forman on the Hood River Hemodiallisis addition, K.C.Brown, Poured In place, and the "Drivit  System" arround steel frame,-- to match existing, with three floors. Everything involved in the building this work. From Top to bottom, well bottom to top would be more correct.

Haskell corp.  Was the Site Superintendant for the North West Natural Gas Pipeline expansion west, including all buildings and site grading. jet engine gas compressor pads and pipe cement stands.

4 Years with Jorgens Const,Tilt ups, Regie Smith.

Several Projects with GG Richartdson Const. Bud Newberry, as General Forman, doing sandwich pannel tilt ups, for Fruit Controled Atmisphere Storage buildings. Panel design and Layout. Roof systems, berkley panel, metal and hollow core concrete roof systems. Slab design and rebar. Underground Piping and Electrical. Including complete finish work  and punch.

Emerick Construction, David Berg,  Mike Burton, 6-8 yrs off and on, of HighSchools, BPA and Hewelet Packard, Vancouver a. large remodels and demo work.  Doors, finish, punch, as well as from the footings to handing the keys to the owners. also a crane rail job at Bonneville Damn between Powerhouse 2 and the Spillway.
Hood River High School, Centinenial High Scool, Estacada High Schools.

 Hoffman Construction, Rory Neive and Stan Presby. Numerious High Rise buildings.
also for Greg Borsna, on the Dalles and Skamania County jails, complete job

Baugh Const. Ted Gay, South Park Square, 16 story housing, footings to complete finish, doors, and punch list work.

Sabey Construction, General Forman on, The Dalles Post Office. Complete Job.

Walsh Construction, Ed Botts, Exterior finish Forman, Select Cedar Siding, Complete exterior of The Dalles
Interpert center.

Mowatt Construction, Tom Duffy,  Expansion of the Hood River Bridge

Kewitt / Al Johnston  , Dan Mansuir, Forman for the Ships brow on the upstream intake section for the Navagation Locks at Bonneville Damn.
Also worked mid-locks doing slip forms for the main channel walls, between the Water tunnels for the intake exhale fill system for the main pool of the locks.

Alliance Systems replace exterior doors and holowmetal jambs for the Homeland Security upgrade at the Bonneville Damn.

This list is not inclusive---------


     Operate all machinery and have a 100 ton crane card.
vehicals on Rubber and Tracks. Backhoes, Trackhoes, Plows, bobcats, boom trucks.    
     In 1977, I started in this business, packing plywood in the home framing industry on Sunnyside Road.

 Graduated to tilt ups and then on to highrise work, to finish, doors and cabinet work.

To supervision, to well, --all of it.

EDUCATION
     Litton Industries Management training  (4yrs)  
     Site management, community education classes            
     Site Superintendent Training, Haskell Corp.
     Forman upgrade skills training
      AGC Harassment seminar,     AGC crane class  100 ton rating
     1973-1975      AA in Radio and Television  Prod.  Pierce College
     1969-1973     High School diploma  ST. Genevieve’s H.S.
     EMPLOYMENT
     22 yrs a Union Carpenter
     In large scale projects, such as; The Navigation Locks at Bonneville Damn, Hospitals,
    Tilt ups to  Housing jobs, including Single Family Dwellings. Spandrel and Red-iron Bridges.
    Performed in all capacities from rough form work, site layout, to fine finish work,
    doors and hardware,  and  Supervision.


            Books on the subject;

            Up the Organization by CEO Robert Townsend, "catch your employees doing good things
            and comend them, rather that constantly goading them with negitive mistakes"

            Peacemaking by Barbara  Stanford, comes in handy, onsite.
           These are tactics to run "Peaceful" jobs, clicking along,
            rather than abrupt,  "Wars" of personalities and ego's

            True North  by CEO  Bill George, Engage your employees to Lead.
           There is a new generation of authentic leaders, in it for the long run,
           not just for short term gain.

           I know this work.


 mailto:Marriedt@aol.com                            Back to Top
--------------------------------------------

 Web Design-Site Management

Resume for Terry Murray

Natural, Interpersonal skills in Managing and Supervising personnel and the ability to interact with Co-workers, Professionals and the Public.

I have the ability to properly coordinate subcontractors in the logistics of  the site and the fulfillment of their contract requirements.

Knowledgeable in reading blueprints and drawings. Using arithmetic and geometry to calculate amounts of materials to be needed, dimensions to be followed and costs of materials, desired for specific project functions.

Creative, extensive skills in Windows Operating Systems, MS Word, MS Excel, MS Works, word processing and spreadsheets. ARC soft Photo Studio and Intuit's Turbo Tax and Quick Books.
I have written  programs in MS Excel. Including, Job Door Bidder, a program to bid doors and hardware installation.

Proficient in Web Site design and maintenance. Using Trelix web design programs,  and Digital Audio Workstations including  ProTools and Cakewalk.
          My Personal Characteristic's;   

   1. Positive outlook
    2. Professional approach to job tasks     
    3. Knowledge of building concepts   
    4. Ability to facilitate change
    5. Friendly, professional relationships with the people involved with the job
    6. Ability to disseminate and delegate tasks
     7. Logistical thought process
     8. Respect from other co-workers

    A team player in the entire process of acquiring and completing projects.


EDUCATION
     Litton Industries Management training  (4yrs)assembler language                
            Superintendent Training, Haskell Corp.
     Forman upgrade skills training
     AGC Harassment seminar
     AGC crane class
            1973-1975      AA in Radio and Television  Prod. Pierce College
            1969-1973      High School diploma  ST. Genevieve's H.S.
     EMPLOYMENT
            Systems Test Engineer   for Litton Industries for 10 years
            22 yrs a Union Carpenter
       Books on the subject;

            Up the Organization by CEO Robert Townsend, "catch your employees doing good things
            and comend them, rather that constantly goading them with negitive mistakes"

            Peacemaking by Barbara  Stanford, comes in handy, onsite.
           These are tactics to run "Peaceful" jobs, clicking along,
            rather than abrupt,  "Wars" of personalities and ego's

            True North  by CEO  Bill George, Engage your employees to Lead.
           There is a new generation of authentic leaders, in it for the long run,
           not just for short term gain.

           I know this work.


 Thank you for your time

---------------------------------------------------------------------------------------------




Lead, Follow or Get out of the Way!!
 there is a time for everything under the sun.





  Web Design-Site Management


(I built and maintain, all the following sites)
clickable  yes

Dont forget my other sites;
Barefootterry  Music Site
Speakers for Everybody
Speakers for Everyone site2
Sound Clips n Stuff
The Tube Amp Hall of Fame
The Tube Amp Hall of Fame site 2
The Tube Amp Hall of Fame site 3
The Tube Amp Hall of Fame site 4
The Tube Amp Hall of Fame site 5
The Tube Amp Hall of Fame site 6
The Tube Amp Hall of Fame site 7
The Tube Amp Hall of Fame site 8
The Tube Amp Hall of Fame site 9
The Tube Amp Hall of Fame site 10
Barefootterry  Music Site
Carpenters Union Local #306
James Marshall Hendrix


Parts and stuff ;
http://illinoiscapacitor.com
http://www.engplanet.com/content/resistorinfo.html by Danny Goodman
http://www.sozoamplification.com/index.html  (Mustard caps)
http://www.metroamp.com
https://ssl.eurotubes.com/index.htm
http://www.matamp.co.uk
http://www.robertkeeley.com/home.php
http://www.jameco.com/
http://www.ams-neve.com/html/downloads/index.php
http://www.audiomedia.com/
http://www.focusrite.com/
http://www.digidesign.com/intl_selector.cfm
https://www.mouser.com/
http://www.ccleaner.com/download/
https://www.allelectronics.com/index.html
http://store.triodestore.com/index.html
http://www.tubesandmore.com/
http://www.magicparts.com/main.htm
http://www.obsoleteelectronics.com/index.htm
http://www.mercurymagnetics.com
http://www.vibroworld.com/parts/tech11.html
http://www.marshallparts.com/content/estore_list.asp?category=4&catname=Marshall
http://www.speakerrepair.com/
http://www.wendellfabrics.com/mellotone/flame.html
http://www.acousticalsolutions.com
http://www.hillsidewirecloth.com/specs1.html
http://www.vguitar.com/
http://www.worldtubeaudio.com/directory/categories/kategorie_61.htm
http://www.winamp.com/
http://www.soundthinking.com/links.html
http://www.hoffmanamps.com/links.htm
http://www.geofex.com
http://www.harmony-central.com/Guitar/Faqs/
http://www.ma.ultranet.com/~larryv/guitarsetup.htm
http://www.washburn.com/chords/akkordfinder.shtm

Just click on what you need


the end

The music business is a cruel and shallow money trench, a long plastic hallway where thieves and pimps run free, and good men die like dogs. There's also a negative side.
- Hunter S. Thompson
----------------------------